iain Posted October 9 Report Posted October 9 6 hours ago, Nigel C said: what is the minimum recommended? 6” , but it needs to be good quality. I couldn’t vouch for the shed floor, test drills, showed variable thickness…farmers who needs them. I then dug out to 500mm as this wasn’t going to be a continuous sheet of concrete and laid steel reinforced C30 and let it cure for nearly 2 months. Total overkill but I feel confident in it😀. Quote
Nigel C Posted October 9 Report Posted October 9 From memory I'm sure I have 6-7" but also thought I might add some larger steel plate feet as I have a pet fabrication shop that do all my metal work for work projects. Quote
Mike C Posted October 9 Report Posted October 9 I'm not a structural engineer , but I believe you need enough reo in the concrete to resist the inwards turning moment of the weight of the car on the lift post arms. Just unreinforced concrete is pretty useless for tension loads - like you'll get on the outside of the floor plates. Quote
Mike Morris Posted November 4 Author Report Posted November 4 On 10/14/2026 at 2:11 PM, Gary Harwood said: Am I being dumb, I really don't understand car electrics! My 6 wouldn't start the other day after 12 months of trouble free use covering about 1,500 miles. With the ignition turned to first position all the dashboard lights came on as usual, as did the fuel and voltmeter dials, but when I tried tried to start the car after priming the fuel, all the lights and dials died and the starter motor did nothing. I changed all the fuses, still nothing, now not even the dash ignition and oil warning lights came on. Charged the battery for 6 hours, despite it having a reasonably good charge. Still nothing. Eventually, after pulling out the wires on both sides of this grey box (alongside the fuse box) and pushing them back in, the car started fine and has just run perfectly for a 20 mile trip. What is this grey box? Is it just a simple wire connection box? Hi Harry, I am going to have to reinforce the concrete (relay) Quote
Malcolm Baker Posted November 4 Report Posted November 4 9 hours ago, Mike Morris said: Hi Harry, I am going to have to reinforce the concrete (relay) Have you considered fitting a large steel plate across the floor connecting the two post bases, thus spreading the load on a much larger area. Quote
harrytr5 Posted November 5 Report Posted November 5 22 hours ago, Mike Morris said: Hi Harry, I am going to have to reinforce the concrete (relay) This is what Busch engineer fitters had brought with them as extra reinforcing but my reinforced concrete slab passed their tests did not need them. Just thought I would show you. Always consult the manufacturer first and they will test your concrete slab before installing. By getting them in to install and a certificate of conformity is the way to go. Best £500 to install that I paid for!. https://www.google.com/url?sa=i&source=web&rct=j&url=https://www.twinbusch.co.uk/product_info.php?products_id%3D195&ved=2ahUKEwjf-rfbzvCXAxV1SfEDHdV0K8MQzM0VegoIAggACAAIJBAC&opi=89978449&cd&psig=AOvVaw3QRQWdYJaLgLaSfmEe0E9E&ust=1793960750440000 Regards Harry Quote
Mike Morris Posted November 5 Author Report Posted November 5 Thanks Harry, I am planning to do the same, I have been told to prepare 1m2 x .5m deep on each side. Apologies for cryptic message, sent from phone whilst at the airport. Where abouts are the posts regarding the doors? is the centre line of the post by the leading edge of door? if you get my drift? Quote
iain Posted November 5 Report Posted November 5 1 hour ago, Mike Morris said: Thanks Harry, I am planning to do the same, I have been told to prepare 1m2 x .5m deep on each side. Apologies for cryptic message, sent from phone whilst at the airport. Where abouts are the posts regarding the doors? is the centre line of the post by the leading edge of door? if you get my drift? Centre point of the posts on mine is level with the “point of balance” for the original through the floor jacking point. Doesn’t present a problem with door opening even on my short/narrow lift. Quote
harrytr5 Posted November 5 Report Posted November 5 3 hours ago, Mike Morris said: Thanks Harry, I am planning to do the same, I have been told to prepare 1m2 x .5m deep on each side. Apologies for cryptic message, sent from phone whilst at the airport. Where abouts are the posts regarding the doors? is the centre line of the post by the leading edge of door? if you get my drift? If not too far from me you can have a play with mine before you decide! Regards Harry Quote