Jump to content
TR Forums

Recommended Posts

Posted

Gentle,

As part of the body restoration the tub was pyrolysed and media blasted then epoxy coated.

I have been asked if the seams such as the joints between the rear inner wings and the rear deck should be lead loaded or filled with some other material. I have nothing to go on as the pyrolysis removed all/any material from panel joints. I assume that the joints between loose panels are not filled.

Your advice please.

Thanks

Posted

I lead fill the joins where the back panel meets the little short panel under the rear lights and the next join above where that panel meets the tonneau extensions either side of the boot lid and where they meet the rear deck and where the forward deck extensions meet the rear deck, when filled I then file the join line back in so it is still seen to there. That way you dont get paint cracks across the joins and it helps to seal them. Same where the sills meet the bottom of the "A" and "B" posts, I seam weld those joints for strength an then lead and file the join lines back in.

Stuart.

 

Marks TR5 367.jpg

Marks TR5 368.jpg

Marks TR5 369.jpg

Marks TR5 370.jpg

Marks TR5 374.jpg

Marks TR5 276.jpg

Marks TR5 277.jpg

Posted

Obviously the wing beading covers the joins to the outer panels. Seam seal all inner and outer panels on the bare shell too 

Stuart.

FWIW these photos were from a L/Hand drive TR5 but basically the same shell.

Marks TR5 390.jpg

Marks TR5 391.jpg

Marks TR5 392.jpg

Marks TR5 394.jpg

Marks TR5 546.jpg

Posted

Thanks Stuart for the information and pictures.

Graham

Posted

Proper job, Stuart. 
 

Don’t imagine there are many places that would have the skills to do that these days. Lovely to see! 

Posted
7 hours ago, stuart said:

I lead fill the joins where the back panel meets the little short panel under the rear lights and the next join above where that panel meets the tonneau extensions either side of the boot lid and where they meet the rear deck and where the forward deck extensions meet the rear deck, when filled I then file the join line back in so it is still seen to there. That way you dont get paint cracks across the joins and it helps to seal them. Same where the sills meet the bottom of the "A" and "B" posts, I seam weld those joints for strength an then lead and file the join lines back in.

Stuart.

 

Great craftsmanship, Stuart.

The skills involved in lead loading and carefully recreating the original panel joint lines are becoming something of a lost art these days.

It's great to see this level of workmanship still being practised.

Francis

Posted
8 hours ago, FBM said:

 

Great craftsmanship, Stuart.

The skills involved in lead loading and carefully recreating the original panel joint lines are becoming something of a lost art these days.

It's great to see this level of workmanship still being practised.

Francis

+1 Exactly.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...