Grahamgl Posted October 27 Report Posted October 27 Gentle, As part of the body restoration the tub was pyrolysed and media blasted then epoxy coated. I have been asked if the seams such as the joints between the rear inner wings and the rear deck should be lead loaded or filled with some other material. I have nothing to go on as the pyrolysis removed all/any material from panel joints. I assume that the joints between loose panels are not filled. Your advice please. Thanks Quote
stuart Posted October 27 Report Posted October 27 I lead fill the joins where the back panel meets the little short panel under the rear lights and the next join above where that panel meets the tonneau extensions either side of the boot lid and where they meet the rear deck and where the forward deck extensions meet the rear deck, when filled I then file the join line back in so it is still seen to there. That way you dont get paint cracks across the joins and it helps to seal them. Same where the sills meet the bottom of the "A" and "B" posts, I seam weld those joints for strength an then lead and file the join lines back in. Stuart. Quote
stuart Posted October 27 Report Posted October 27 Obviously the wing beading covers the joins to the outer panels. Seam seal all inner and outer panels on the bare shell too Stuart. FWIW these photos were from a L/Hand drive TR5 but basically the same shell. Quote
Grahamgl Posted October 27 Author Report Posted October 27 Thanks Stuart for the information and pictures. Graham Quote
Ben Davies Posted October 27 Report Posted October 27 Proper job, Stuart. Don’t imagine there are many places that would have the skills to do that these days. Lovely to see! Quote
FBM Posted October 28 Report Posted October 28 7 hours ago, stuart said: I lead fill the joins where the back panel meets the little short panel under the rear lights and the next join above where that panel meets the tonneau extensions either side of the boot lid and where they meet the rear deck and where the forward deck extensions meet the rear deck, when filled I then file the join line back in so it is still seen to there. That way you dont get paint cracks across the joins and it helps to seal them. Same where the sills meet the bottom of the "A" and "B" posts, I seam weld those joints for strength an then lead and file the join lines back in. Stuart. Great craftsmanship, Stuart. The skills involved in lead loading and carefully recreating the original panel joint lines are becoming something of a lost art these days. It's great to see this level of workmanship still being practised. Francis Quote
Kevo_6 Posted October 28 Report Posted October 28 8 hours ago, FBM said: Great craftsmanship, Stuart. The skills involved in lead loading and carefully recreating the original panel joint lines are becoming something of a lost art these days. It's great to see this level of workmanship still being practised. Francis +1 Exactly. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.